Well, it took 3 weeks to get the flooring but one day to wear me out!
I'm doing OK but I really don't know how to do doorways. I can get the flooring under the first door frame, but I can't figure out how to do the other side. I have cut under the frame but there isn't enough room to slide it under the cut and still snap it to the already-installed piece. Any suggestions would be appreciated.
I'm going from one room to another through the doorways, so I have to work backward to the wall in the second room. In other words, I started at the top of a U and have to turn the bottom and backtrack to do the other side of the U. Fortunately it's only a short way back.
I skipped the knee pads today because I was doing a lot of demolition on an old plywood and peel-&-stick floor. My knees feel OK, but my back is crying for a nice hot shower. Which is where I'm heading right now.
More tomorrow.
Bookmarks